Baltimore is served mainly by Baltimore Gas and Electric (BGE). Maryland's residential price in the calculator is 19.53¢ per kWh, the EIA 2025 annual residential average. The August 2026 monthly residential price was 21.40¢ per kWh, a single summer month, not an annual average. Neither figure is a utility tariff. Modeled annual output for Baltimore is 1,415 kWh per kW-year under NREL PVWatts v8 (1 kW, 25° tilt, south-facing, 14% losses, default weather, queried November 9, 2026). That is a model, not a roof study. Statewide context is on the Maryland solar page.

BGE, from application to permission to operate

BGE serves Baltimore City. BGE's getting-started page says applications for systems of 20 kW AC or less may take up to 20 days to process. After approval, BGE mails the interconnection agreement within 5 business days, and you have 30 calendar days to sign it. Permission to operate comes by email after the certificate of completion, a passed inspection, and the net-meter install. The contractor application steps are on BGE's interconnection page.

Those BGE estimates sit on top of the statewide COMAR Level 1 clocks: 5 business days for completeness, 15 for the safety review, and permission to operate within 20 business days of acceptable final documents. Level 1 is an inverter system of 20 kW or less.

City zoning for a roof array

Baltimore's zoning code, §15-517, is the local rule that actually changes the drawing. A building-permit application needs an electrical line drawing. A roof system may rise no more than 42 inches above the roof surface. On a flat roof, the array must be set back 3 feet from the front façade. Roof systems are a permitted height exception, so the height limit for the house is not the same test as the 42-inch rule.

Permits go through DHCD E-Permits. That permit is separate from the BGE application. You need both.

CHAP historic districts

If the house is in a CHAP historic district, CHAP reviews the work before DHCD issues the permit. The city's special-referrals page is the map of that extra step. A flat-roof rowhouse can still fit an array when it stays inside the 42-inch height and the 3-foot front setback. In a CHAP district, placement and what a person sees from the street are part of the review, not an afterthought.

The city property-tax credit, and the county credit next door

Baltimore City Code Article 28 §10-31 offers a credit of 50% of eligible cost, up to $5,000 ($1,500 if the system is hot water only). The credit cannot exceed the city property tax for that year. It applies the tax year after you apply, and it can transfer to a buyer inside the one-year window. The code says no applications are accepted after June 30, 2028. Confirm with City Finance that the credit is funded and open before a proposal counts it.

Baltimore County is a different government and a different credit: 50% or $5,000, whichever is less, with a two-year carry-forward, and it ends when the house is sold (county tax credits). Towson is the county, not the city. The permit office and the credit both change at the city line. See Towson. Columbia is Howard County and BGE, with its own Solar Express permit. Annapolis is also typically BGE, with city historic review downtown.

The July 1, 2027 question

Baltimore customers are in the same statewide transition as the rest of Maryland. Current net metering stays open until 3,000 megawatts or July 1, 2027. The PSC draft lists three possible cutoffs, from filing an interconnection application to receiving permission to operate. The rule is not final. The practical plan is to ask BGE, in writing, which test it is applying, and to read the transition guide rather than a salesperson's single date.

What a kilowatt produces here

NREL PVWatts v8, queried November 9, 2026, models Baltimore at 1,415 kWh per kW-year for a 1 kW system at 25° tilt facing south, with 14% losses. December in that run is about 83 kWh per kW, and July is about 146. That is a model, not a roof study. A rowhouse with a small plane, a party wall, or a tree will land below it. Nearby cities in the same weather family can be within 3% of this number, which is not a meaningful difference.

Installed-price context for Baltimore is the national Berkeley Lab median, discussed on the Maryland cost guide. It is not a BGE quote and not a city quote. The federal residential credit does not apply to a system installed after December 31, 2025.

Official links

Baltimore questions

Will a flat-roof rowhouse array be allowed in Baltimore?

City zoning allows a roof array that stays within 42 inches of the roof surface and, on a flat roof, 3 feet back from the front façade. The permit application needs an electrical line drawing. A house in a CHAP district also needs CHAP review before DHCD issues the permit.

How long does BGE take?

BGE says an application for a system of 20 kW AC or less may take up to 20 days to process. The agreement is mailed within 5 business days of approval, and you have 30 calendar days to sign. Permission to operate is emailed after the certificate of completion, a passed inspection, and the meter work. COMAR also sets 5, 15, and 20 business-day clocks for Level 1.

Does the Baltimore City tax credit transfer if I sell?

The city code says the credit can transfer to a buyer inside the one-year window. Baltimore County's credit ends on sale. Confirm with City Finance that the city credit is funded before you count it. Applications are not accepted after June 30, 2028.

Who serves Baltimore?

BGE, for a typical city address. The permit is the city's. The export credit is BGE's rider, not the EIA state average.

If I sign in spring 2027, am I grandfathered?

A signature is not the statutory test. The current tariff stays open until 3,000 megawatts or July 1, 2027, and the PSC draft still lists three possible cutoffs. Ask BGE in writing which test applies.

Other Maryland cities

American Solar Savings explains these figures and can connect you with an installer in our network. We do not install the system.

Sources

Figures on this site are cited so you can check them. They are not a quote for a house, and they go stale when the publisher updates them.

See your Baltimore estimate

Enter your ZIP code and a typical bill. You can review the estimate before you request a call.

See my estimate
See my estimate