Solar in Maryland: Costs, Utility Rules & Planning
Incentive snapshot: current net metering stays open until the earlier of 3,000 MW or July 1, 2027. The successor rate is not set. On November 9, 2026, a broker sell-now quote was $40 for a standard Maryland SREC and $58.50 for a certified Brighter Tomorrow SREC. Quotes move. Not a promise you qualify.
Updated November 9, 2026.
Maryland's residential price in the calculator is 19.53¢ per kWh, the EIA 2025 annual residential average. The August 2026 monthly residential price was 21.40¢ per kWh, a single summer month, not an annual average. Neither figure is a utility tariff. City production figures for Maryland use NREL PVWatts v8 annual output. They are not the rounded peak-sun-hour input inside the bill estimate.
National price range
Three published cases
National context on the Maryland page, not a local estimate. Berkeley Lab medians for host-owned U.S. systems installed in 2025, applied to the national 7.7 kW median size.
Cash
$3.00/W
$23,100
Subset classified as cash
Middle published case
$3.60/W
$27,720
All host-owned systems
Loan
$4.50/W
$34,650
Financed subset, before interest
Before incentives. A loan price here excludes interest. The federal residential credit under section 25D ended for systems placed in service after December 31, 2025. Berkeley Lab, U.S. Distributed Solar and Storage, August 2026 data update.
The 2027 net-metering deadline
Current Maryland net metering stays open to new customers until the earlier of a 3,000 megawatt cap or July 1, 2027, under House Bill 1532. The Public Service Commission must approve a successor framework by February 1, 2027, and that program starts July 1, 2027. Current and successor programs share a combined 6,000 megawatt cap. The dates are in the PC 78 notice and the fiscal note.
What a new customer has to finish by July 1, 2027 is not settled law. The PSC's draft rule, RM 56, lists three possible cutoffs. The comment notice set a comment deadline of July 24, 2026 and a rulemaking session of August 11, 2026. Ask the utility in writing which test it is using, and read the 2027 transition guide before you treat a sales deadline as final.
Incentives that exist now
The Maryland Solar Access Program is a grant for income-eligible households: $750 per kilowatt, up to $7,500. Apply before the system is installed. The posted deadline is May 31, 2027, or sooner if the budget runs out.
Maryland SRECs are a separate, moving price. On November 9, 2026, Flett Exchange showed a $40.00 sell-now quote for standard 2023 through 2026 vintages, and $37.00 for the 2022 vintage. Flett's penalty-price table on that page listed $45 for 2026 and $35 for 2027. The solar requirement on that dashboard was 8.0% in 2026 and 9.5% in 2027.
Certified Brighter Tomorrow SRECs count at 1.5 times for compliance. On the same day, the certified dashboard showed $58.50 sell-now for the 2025 and 2026 vintages. New systems placed in service from July 1, 2024 through January 1, 2028 can apply, within caps that include the first 300 MW AC of systems at or under 20 kW. A broker quote is not a contract.
Qualifying solar is exempt from Maryland property tax under Tax-Property §7-242 and from the state sales tax under Tax-General §11-230. Those are state exemptions. County credits, below, are separate and uneven.
County and city property tax credits
These are property-tax credits, not checks from the installer. Each one has its own form, cap, and end date. Harford and Prince George's credits are left off this table until the counties publish them.
| Place | Credit | What to know |
|---|---|---|
| Baltimore City | 50% of eligible cost, up to $5,000 | Can transfer to a buyer inside a 1-year window. No applications after June 30, 2028. We have not confirmed that City Finance is funded and accepting applications right now. |
| Baltimore County | 50% of cost or $5,000, whichever is less | Two-year carry-forward. The credit ends when the house is sold. This is a different program from the city credit. |
| Anne Arundel County | Lesser of 50% of cost or $2,500, one time | Building portion only. Apply by June 1. County Code §4-2-316. The application form we found is dated 2023, so confirm it is the form Finance still accepts. |
| Howard County | 50% or $5,000 on the form | Code §20.128A. Apply by June 30. County pages we checked emphasize geothermal, so confirm with Finance that solar electric systems qualify before you count this credit. |
| Montgomery County | Suspended | The county solar tax credit application says the credit was suspended in 2011. |
A credit that is in the code can still be unfunded, closed, or limited to a device the form does not name. Ask the finance office before a proposal treats it as cash.
Utilities
The company on the bill does the interconnection. A suburb one county over can be a different company. We did not find an official Delmarva day-count that is still online, so Delmarva is listed for the COMAR clocks that apply to every Maryland utility, without a separate timeline.
| Utility | Typical area | Official page |
|---|---|---|
| BGE | Baltimore and much of central Maryland | Getting started |
| Pepco | Montgomery and Prince George's counties | Maryland interconnection brochure |
| Potomac Edison | Frederick and much of western Maryland | FirstEnergy Maryland |
| SMECO | Southern Maryland | Solar FAQ |
| Delmarva Power | Much of the Eastern Shore | Uses the COMAR Level 1 clocks below. No separate official day-count is cited here. |
How long permission to operate can take
COMAR 20.50.09.08 sets Level 1 as a certified inverter system of 20 kW or less. The clocks in COMAR 20.50.09.09 are 5 business days to review an application for completeness, 15 business days for the safety review, and permission to operate within 20 business days after the utility receives acceptable final documents. Those clocks apply to BGE, Pepco, Delmarva, Potomac Edison, and SMECO.
BGE says applications for systems of 20 kW AC or less may take up to 20 days to process. After approval, BGE mails the interconnection agreement within 5 business days, and the customer has 30 calendar days to sign. Permission to operate arrives by email after a certificate of completion, a passed inspection, and the net-meter install. Pepco says technical review may take up to 20 business days for systems of 2 MW AC or less, measured from a completed application. Potomac Edison points to the COMAR clocks and does not publish a separate typical-days figure. SMECO's FAQ describes the steps and does not publish a day-count.
Work backward from the date you care about: county or city permit, utility approval, installation, inspection, certificate of completion, meter work, then permission to operate. A signed contract is not the last step.
Permits
Maryland says counties must adopt automated solar permitting, such as SolarAPP+, by August 1, 2027 (Maryland Energy Administration). Three paths are already live. Montgomery County DPS eSolar issues an instant building permit for a qualifying rooftop system and still requires a separate electrical permit. The City of Rockville has its own permit office and has adopted SolarAPP+ (city announcement). Howard County's Solar Express is an instant online permit for qualifying residential rooftop systems, and the upload list includes HOA approval.
Bethesda and Silver Spring are unincorporated Montgomery County, so they use DPS eSolar. A Rockville city address uses the city's office. The Rockville page covers that split.
If an HOA says no
Maryland's solar-rights law, Real Property §2-119, says a restriction is unreasonable if it raises the cost by 5% or more, or cuts output by 10% or more. The homeowner has to document that with a NABCEP-certified designer, or with a designer who has completed 30 solar designs in three years. The statute is the test. An association can still ask about placement, wiring color, and a reasonable process.
Cities
- Baltimore
BGE in the city, with rowhouses downtown and detached roofs in the counties.
- Annapolis
BGE on the Severn, with historic roofs downtown and suburban roofs farther out.
- Frederick
Potomac Edison, a FirstEnergy utility, not BGE and not Pepco.
- Rockville
Pepco in Montgomery County, with newer roofs and a high share of two-story houses.
- Columbia
A planned community on BGE, with village associations and a lot of similar roofs.
- Towson
BGE in northern Baltimore County, with older shaded lots and newer subdivisions.
The Rockville page also covers Bethesda and Silver Spring. Those Montgomery County addresses use county permits. Annapolis, Towson, and Columbia stay on their own pages.
Maryland questions
Does solar raise my Maryland property tax?
Qualifying solar energy property is exempt from Maryland property tax under Tax-Property §7-242. County tax credits are a separate program and are not available in every county.
Can my HOA say no to solar?
Real Property §2-119 says a restriction is unreasonable if it raises the cost by 5% or more or reduces output by 10% or more. You need documentation from a NABCEP-certified designer, or from a designer with 30 solar designs in three years. An association can still require a review.
Is there a Maryland solar tax credit?
The statewide program for income-eligible households is the Maryland Solar Access Program grant, $750 per kilowatt up to $7,500, not a state income-tax credit. County property-tax credits differ. Montgomery County's solar credit has been suspended since 2011.
Does the Maryland estimate use BGE's rate?
No. The calculator uses the 2025 EIA statewide annual average, 19.53¢ per kWh. The August 2026 monthly price was 21.40¢ per kWh, a single summer month. BGE, Pepco, Potomac Edison, Delmarva, and SMECO each have their own tariff.
If I sign a contract in 2027, am I on the current net-metering tariff?
Signing a contract is not the test in the statute. House Bill 1532 keeps the current tariff open until 3,000 megawatts or July 1, 2027. The PSC draft lists three possible cutoffs, and the rule is not final. The transition guide walks through them.
American Solar Savings explains these figures and can connect you with an installer in our network. We do not install the system.
Sources
- EIA Electric Power Annual, Table 2.10, residential average price, 2025
- EIA: average electricity prices are not the same as a utility rate
- NREL National Solar Radiation Database. Rounded peak-sun-hour figures are the bill estimate's planning input, not PVWatts plane-of-array irradiance.
- Berkeley Lab, U.S. Distributed Solar and Storage, August 2026 data update
- IRS FAQs on Public Law 119-21 and sections 25C, 25D, and related credits (updated August 21, 2025)
- EIA Electric Power Monthly, Table 5.6.A, residential price, August 2026 (a single summer month, not an annual average)
- NREL PVWatts v8: 1 kW DC, 25° tilt, south-facing, 14% losses, default weather. Modeled annual output, not a site survey. The page states the query date.
- Maryland PSC notice on House Bill 1532 and the net-metering successor program (PC 78)
- Maryland PSC fact sheet, Brighter Tomorrow Act (Senate Bill 783) certified SRECs
- Flett Exchange, Maryland certified SREC dashboard, sell-now quotes checked November 9, 2026
- Flett Exchange, Maryland SREC dashboard, sell-now quotes checked November 9, 2026
- Maryland House Bill 1532, enrolled Utility RELIEF Act
- House Bill 1532 fiscal and policy note
- PSC proposed regulations, RM 56
- Maryland Solar Access Program
- COMAR 20.50.09.08, Level 1 interconnection
- Tax-Property §7-242, solar property-tax exemption
- Real Property §2-119, solar restrictions in covenants
Figures on this site are cited so you can check them. They are not a quote for a house, and they go stale when the publisher updates them.
See a Maryland bill estimate
Enter your ZIP code and a typical bill. The estimate uses state-average assumptions.