Maryland net metering in 2027: a transition for new applicants
American Solar Savings · Published 2026-11-04 · Updated 2026-11-24
Maryland is moving from its current net-metering tariff to a successor program. This is a transition for new applicants. It is not a statement that every system already on net metering ends on a single day.
What changes, and when
House Bill 1532, the enrolled Utility RELIEF Act, requires utilities to offer the current net-metering contract or tariff until the earlier of a 3,000 megawatt statewide cap or July 1, 2027. The Public Service Commission notice opening Public Conference 78 says the Commission must approve a successor framework by February 1, 2027, and that the new program begins July 1, 2027. The fiscal note says the current and successor programs share a combined 6,000 megawatt cap. A capacity cap can close the current tariff to new customers sooner. Signing a contract is not, by itself, proof that a house has qualified.
October 27, 2026
The working-group draft report and framework were due, under the PC 78 notice.
February 1, 2027
The PSC must approve the successor framework.
July 1, 2027
The successor program starts, unless the 3,000 MW cap closes the current tariff first.
What do I need by July 1, 2027?
The statute says a customer who is under a net-metering contract or tariff on July 1, 2027 stays eligible for a period the Commission sets by regulation. It does not define the milestone a new project has to hit. The only official PSC text this page can cite is the draft rule in RM 56. Proposed COMAR 20.50.10.01(D)(1)(c) lists three versions. The comment notice set comments due July 24, 2026 and a rulemaking session on August 11, 2026.
| Version | What would have to be done by July 1, 2027 | Who the draft says supported it |
|---|---|---|
| 1 | Submit an interconnection application on or before that date | MEA, MDOT, Howard County, MRSC, SEIA, CHESSA, and CCSA |
| 2 | Have received permission to operate from the utility | Potomac Edison, PHI, and BGE |
| 3 | Have an executed interconnection agreement. Applicants who had not signed would take the successor program, with prioritized review | Commission staff |
The PSC's draft rule lists three possible cutoffs, from filing an interconnection application to receiving permission to operate by July 1, 2027. Utilities backed the permission-to-operate test, and industry groups report the Commission advanced it. The rule is not final. Ask your installer and utility in writing which test applies, and plan as if you need permission to operate by July 1, 2027.
This page does not treat a secondary report as an adopted order. No PSC order or Maryland Register publication adopting one version is cited here.
How long permission to operate takes
COMAR 20.50.09.08 sets Level 1 as a certified inverter system of 20 kW or less. COMAR 20.50.09.09 gives the utility 5 business days to check that an application is complete, 15 business days for the safety review, and 20 business days after it receives acceptable final documents to grant permission to operate. Those clocks cover BGE, Pepco, Delmarva, Potomac Edison, and SMECO.
BGE says an application for 20 kW AC or less may take up to 20 days to process. BGE mails the interconnection agreement within 5 business days of approval, and the customer has 30 calendar days to sign. Permission to operate is emailed after the certificate of completion, a passed inspection, and the net-meter install. Pepco's Maryland brochure says technical review may take up to 20 business days for systems of 2 MW AC or less, counted from a completed application.
Work backward from July 1, 2027 if that date matters to you: county or city permit, utility approval, installation, inspection, certificate of completion, meter work, then permission to operate. The permit and the utility application are two clocks. The solar in Baltimore page spells out the city zoning rules that sit in front of BGE.
This page does not cite a Delmarva, SMECO, or Potomac Edison "typical days" number. Those figures were not found on an official page.
Customers already on net metering
The enrolled bill says an eligible customer-generator that is under a net-metering contract or tariff on July 1, 2027 remains eligible for a length of time the Commission sets by regulation, after a stakeholder proceeding. Those regulations are also to cover conditions that can end eligibility and decommissioning requirements. This page does not treat a draft rule or a sales deadline as that order. Community solar has separate queue rules in the same section.
Credits and grants that still apply
Standard Maryland SRECs and certified Brighter Tomorrow SRECs are different products. On November 9, 2026, Flett Exchange showed a $40.00 sell-now quote for standard 2023 through 2026 vintages and $37.00 for 2022. The same dashboard's penalty-price table listed $45 for 2026 and $35 for 2027, with a solar requirement of 8.0% in 2026 and 9.5% in 2027. The certified dashboard showed $58.50 sell-now for 2025 and 2026 certified vintages. Certified credits count at 1.5 times, for systems placed in service from July 1, 2024 through January 1, 2028, inside the caps, including the first 300 MW AC of systems at or under 20 kW. A sell-now quote is that morning's bid. It is not income you are owed.
The Maryland Solar Access Program is a grant for income-eligible households: $750 per kilowatt, up to $7,500. Apply before the system is installed. The posted end is May 31, 2027, or when the budget runs out.
The successor program's export rate is not set. This page does not guess a post-2027 cent.
BGE, Pepco, Potomac Edison, Delmarva Power, and SMECO each have to carry out whatever the Commission approves. The COMAR clocks are the same. The tariff on the bill is not. Start with the city that matches the bill: solar in Baltimore, solar in Annapolis, solar in Rockville, or solar in Frederick. The Maryland solar page has the county credit table. Installed-price context, which is a national median and not a utility quote, is on the Maryland cost guide.
Questions
If I sign a contract in May 2027, am I grandfathered?
Not by the signature. The statute looks at whether you are under a net-metering contract or tariff on July 1, 2027, and the draft rule lists three earlier milestones that could be the real test. Ask the utility which one it is applying. Plan the calendar as if permission to operate has to be in hand by July 1, 2027.
Does my utility matter?
Each utility has to implement the statute. The COMAR Level 1 clocks are the same for BGE, Pepco, Delmarva, Potomac Edison, and SMECO. The application portal, the agreement, and today's rider are still that company's.
What will the successor pay?
The Commission has to approve the framework by February 1, 2027. The cents are not a finished rider. A proposal that prints a post-2027 export rate as if it were final is ahead of the docket.
The federal residential credit under section 25D ended for systems placed in service after December 31, 2025. The IRS treats the expenditure as made when the original installation is completed. A Maryland proposal that subtracts 30 percent from a 2026 price is using a rule that no longer applies to a new homeowner-owned system. Read the federal tax credit page. This is not tax advice.
See a bill estimate
Enter your ZIP code and a typical electric bill. You can review the estimate before you decide whether to request a call.