Pa net metering is a two-step bill credit. A kilowatt-hour that offsets power the utility delivered is credited at the full retail rate. A kilowatt-hour still banked when the year ends on May 31 is paid at the price to compare. The utilities that have to offer the credit do not all describe that second step in the same words.
What the credit is
52 Pa. Code §75.13(d) says an electric distribution company and a default service provider credit each kilowatt-hour from a Tier I or Tier II system at the full retail rate. That rate includes generation, transmission, and distribution, up to the electricity used in the billing period. Kilowatt-hours above that use carry forward at the full retail rate and accumulate until the end of the year.
§75.12 defines the year as June 1 through May 31. §75.13(e) says the default service provider then pays for remaining excess kilowatt-hours at its price-to-compare rate. The PUC fact sheet, updated October 2024, says excess still on the bill for May is reimbursed at the price to compare, and it describes that rate as the unbundled generation and transmission rates. §54.182 defines the price to compare as the sum of all unbundled generation and transmission charges for that month of default service.
The Department of Environmental Protection tells residents that a home solar system up to 50 kW can net meter, with excess generation credited at the full retail rate. The regulation splits that sentence. The monthly offset is full retail. The May 31 remainder is the price to compare.
Each billing period
Credit at the full retail rate, including generation, transmission, and distribution, up to the kilowatt-hours the company delivered.
Later months in the same year
Unused kilowatt-hours carry forward and offset later use at the full retail rate.
May 31
The year in §75.12 ends. Remaining kilowatt-hours are paid at the default service provider's price to compare.
§75.13(j) keeps the same rate structure and the same monthly charges that other customers on that default service rate pay. §75.13(k) bars a fee other customers do not pay, unless this chapter or a Commission order authorizes it. PPL's rider, effective July 1, 2026, and Duquesne Light's net-metering page both leave the customer charge in place. Energy charges can net to zero and the customer charge can remain.
Who can use it
§75.13(a) requires electric distribution companies and default service providers to offer net metering, first come, first served, for generation on the customer's side of the meter. The customer needs electric load behind the meter with a purpose other than running the generating system. The owner or operator cannot be a utility. §75.11 addresses electric generation suppliers and electric distribution companies.
| Service | Nameplate cap | Section |
|---|---|---|
| Residential | Not greater than 50 kW | §75.13(a)(3) |
| Other customer locations | Not larger than 3 MW | §75.13(a)(4) |
| Systems that meet §75.16 | Above 3 MW and not larger than 5 MW | §75.13(a)(4) |
| Commission approval | 500 kW or larger, under §75.17 | §75.13(a)(5) |
That section does not state a statewide megawatt cap. PPL's rider and the FirstEnergy Pennsylvania tariff, effective April 1, 2026, both keep service available while the generators do not harm service to other customers or the protection schemes on the distribution system.
The PUC's company list names 11 electric distribution companies. PECO, PPL, Duquesne Light, and the FirstEnergy Pennsylvania companies Met-Ed, Penelec, Penn Power, and West Penn Power are the ones behind the city pages below. Citizens' Electric, Pike County Light & Power, UGI, and Wellsboro Electric are on the same list. This page stops at electric distribution companies and electric generation suppliers, which is the scope in §75.11.
Read the utility page next to the regulation
| Source | Leftover energy at the end of the year |
|---|---|
| §75.13(e) and the PUC fact sheet | Paid at the price to compare. The fact sheet describes that rate as generation and transmission. |
| PPL rider, effective July 1, 2026 | Banked through the PJM planning period that ends May 31, then paid at PPL's Price to Compare. On a time-of-use rate, the May 31 bank is paid at the generation portion of the time-of-use rate from the hour the excess was stored. |
| Duquesne Light | May 31 true-up at Duquesne's current price to compare. That page lists generation, transmission, and the Pennsylvania tax adjustment. Its full retail credit also includes distribution. |
| PECO solar FAQ | A May 31 credit for kilowatt-hours above the kilowatt-hours PECO delivered. A separate answer says PECO pays at the Price to Compare and describes that figure as a 12-month average of generation prices. |
| FirstEnergy Pennsylvania tariff, effective April 1, 2026 | The monthly credit is the full retail rate, up to energy delivered. The annual line pays the rider's phrase "full retail value for all energy produced," consistent with Commission regulations. The company FAQ credits excess at the generation component. |
When a company page and §75.13(e) use different words for the May 31 payment, ask that company which rate it is applying. This page follows the regulation for the rule and quotes the company page beside it.
A proposal that prices every exported kilowatt-hour at the full retail rate for the life of the system is skipping the year-end line. The monthly offset can be full retail. Under the regulation, the May 31 remainder is the price to compare. The cents move. The Pennsylvania solar page and the Pennsylvania cost guide are where those posted prices are kept. This page does not reprint them.
Shopping is a different credit. §75.13(f) says an electric generation supplier states its own terms in the service agreement. The distribution company credits customer-generators who buy from a supplier at the company's unbundled distribution rate, applied against distribution use. Unused distribution credits are cleared at the end of the year. §75.13(b) says a supplier may offer net metering. The PUC fact sheet says a supplier does not have to. §75.13(g) treats a switch of supplier as the end of the year. PPL's rider follows that split. PECO's FAQ says that on a switch, PECO pays the excess then owed and stops compensating later excess.
Meters and the credits
§75.14(a) requires a single bidirectional meter that records flow in both directions at the same rate, unless the customer agrees to two meters. If the meter cannot do that, §75.14(b) has the distribution company install one at its expense. PECO's FAQ says the bidirectional meter is provided at no charge, a service over 320 amps uses two meters, and a commercial installation requires two meters.
§75.13(i) leaves alternative energy credits with the customer-generator unless a contract assigns them or the customer rejects them under §75.14(d). The PUC fact sheet says one credit is created for each 1,000 kWh, and that the facility is registered with the credit administrator and with PJM-GATS. A dollar price is not printed here. The SREC guide is the page for the market. A proposal that counts credit income needs the contract.
Virtual meter aggregation is in §75.12 and §75.14(e). The accounts have to belong to the same person or company, sit in one distribution company's territory, lie within 2 miles of the generating property, and each location needs its own electric load. The customer pays the company's incremental cost of billing the accounts that way. One house meter does not use it.
Duquesne says Rider 21 customers file a W-9, and that a May 31 refund of $600 or more produces a Form 1099. That is Duquesne's page. It is not tax advice, and it is not a rule this page copies onto the other companies. FirstEnergy's Pennsylvania FAQ says the company has no company-sponsored residential rebate for customer-owned generation. PECO's FAQ says community solar is not approved in Pennsylvania.
Level 1 review is 10 kW, not 50
A home system can qualify for net metering at 50 kW and still miss Level 1.
§75.34 uses Level 1 for a certified inverter system of 10 kW or less. §75.37 sets the clocks. The company has 10 business days to say the application is complete or to name what is missing, then 15 business days to decide the equipment can interconnect safely under the Level 1 screens. After the certificate of completion, it has 10 business days for a witness test, or the test is waived. The customer has 30 business days to sign the agreement. Local code approval is a condition. A system that fails Level 1 can be filed at a higher level and keep its queue position.
Duquesne posts a Level 1 application fee of $100 for a certified inverter system of 10 kW AC or less, and says the fee is not returned if the project is cancelled. PECO's FAQ says its fee depends on the level. The dollar is on PECO's table, so it is not printed here. This page also does not print a PPL or FirstEnergy application fee.
PECO says the system stays off until the application is approved and PECO has signed the certificate of completion. FirstEnergy's interconnection page says the bidirectional meter can take several weeks, and that some meters already on the house count exported energy as energy the company delivered. Leave the system off until the company says otherwise.
The city permit is a separate clock. Philadelphia is the PECO city page. Pittsburgh is Duquesne Light. Harrisburg is a PPL city. PECO's FAQ says the municipality or a certified inspector does the inspection. PECO and Duquesne both say a system tied to the grid does not run the house in an outage unless it can isolate from the distribution system and the company has approved that setup.
Bills in committee
The text of §75.12 and §75.13 in force took effect November 19, 2016. Two bills in the 2025-2026 session would amend the Alternative Energy Portfolio Standards Act. The General Assembly's posted history shows no vote on either one.
November 19, 2016
The current text of §75.12 and §75.13 took effect.
December 10, 2025
Senate Bill 1019 was referred to the Senate Consumer Protection and Professional Licensure committee.
April 7, 2026
House Bill 2348 was referred to the House Energy committee.
April 14, 2026
The House Energy committee held a hearing. The PUC chairman testified on House Bill 2348.
House Bill 2348, Printer's No. 3139, would call a system not larger than 50 kW a small customer-generator and would credit that class "full retail value for all energy produced on an annual basis." The bill defines full retail value as the retail rate including generation, capacity, transmission, and distribution. A large customer-generator, above 50 kW and up to 3,000 kW, would be paid "avoided cost," defined in the bill as the average locational marginal price of energy, capacity, and transmission and distribution grid services, as the Commission determines it. Large systems already operating, or with an interconnection application submitted before September 1, 2025, would keep a full-retail treatment until the generating equipment is replaced or December 31, 2050, whichever is sooner. The bill would also remove the 2-mile limit on virtual meter aggregation.
The chairman's April 14, 2026 testimony says accounts of 50 kW or less would see no change from the current rules, and that new customers above 50 kW and up to 3,000 kW would. The testimony also reads the bill's full-retail-value definition as aimed at the price to compare. The bill text includes distribution in that definition. Both documents are public. Neither one replaces §75.13 while the bill is in committee.
Senate Bill 1019 was referred to committee on December 10, 2025. Its small-system subsection would give full retail value, on an annual basis, to a system not greater than 50 kW at a home or not greater than 3,000 kW at another service location. It is a separate bill, and it is still in committee.
Where the bill sends you
The delivery company on the bill is the company that interconnects. A retail supplier, if the account has one, sits on top of that and may not credit exports at all. Start with the city that matches the delivery company: Philadelphia, Pittsburgh, or Harrisburg. The Pennsylvania page keeps the price-to-compare table. Equipment price context is the Pennsylvania cost guide. A short version of how export credits differ by state is net metering, explained.
Questions
What does net metering in Pennsylvania pay?
For a customer on default service, §75.13(d) credits kilowatt-hours at the full retail rate, including generation, transmission, and distribution, up to the kilowatt-hours the company delivered in the billing period. The rest carries forward inside the June 1 through May 31 year. On May 31, §75.13(e) pays what is left at the price to compare. §54.182 defines that price as generation and transmission charges. A chart that uses the full retail rate for the May 31 remainder is using a rate the regulation does not set for that step.
What if the supply comes from a retail supplier?
The distribution company credits the distribution rate, and unused distribution credits are cleared at the end of the year. The supplier writes its own export terms, and it does not have to offer any. A switch of supplier is treated as the end of the year. PECO's FAQ says PECO pays the excess owed at the switch and does not compensate excess after that.
Is the home cap 50 kW or 10 kW?
Both numbers are real, and they measure different things. Fifty kilowatts is the residential nameplate cap for net metering. Ten kilowatts is Level 1 interconnection review, for a certified inverter, with the clocks in §75.37. A system between those two sizes can still net meter. It is reviewed on a higher level.
Does House Bill 2348 change a house this year?
The bill is in the House Energy committee, with no posted vote. Its text would pay systems of 50 kW or less full retail value for all energy produced in the year. The PUC chairman told the committee those accounts would see no change. The rule to plan on is §75.13. If the utility page uses a different phrase for the May 31 payment, ask the utility, in writing, which rate it applies.
Sources
- 52 Pa. Code §75.11, scope
- 52 Pa. Code §75.12, definitions, including the June 1 through May 31 year
- 52 Pa. Code §75.13, net metering
- 52 Pa. Code §75.14, meters and virtual meter aggregation
- 52 Pa. Code §75.34, interconnection review levels
- 52 Pa. Code §75.37, Level 1 interconnection review
- 52 Pa. Code §54.182, price-to-compare definition
- PUC fact sheet, Alternative Energy Portfolio Standards Act, updated October 2024
- PUC list of electric distribution companies
- PUC chairman testimony on House Bill 2348, April 14, 2026
- Pennsylvania DEP, solar resources for residents
- PPL net-metering rider, effective July 1, 2026
- Duquesne Light, customer-owned generation
- PECO solar FAQ
- FirstEnergy Pennsylvania electric service tariff, effective April 1, 2026
- FirstEnergy Pennsylvania interconnection FAQ
- FirstEnergy Pennsylvania interconnection steps
- House Bill 2348, Printer's No. 3139, and its status
- Senate Bill 1019 status
See a bill estimate
Enter your ZIP code and a typical electric bill. You can review the estimate before you decide whether to request a call.